Fishing - December 2nd, 2010
Snook
Three of the pools have arrived
Photos from November 4th, 2010
Pool view looking at 9
Pools on barge
Building 21, piles sunk and footers poured
Building 24, ground beam formed
Building 22, piles sunk and footers poured
Building 20, piles in place
Columns sunk and footers poured for building 22
Building 19, exterior detail
Building 16, piles sunk in
Columns sunk and footers poured for building 21
Ground beam formed for building 24
Pilings in for building 20
Pilings going in on building 16
Detail work, building 19
Detail work, building 19
Building 23, walls going up
Walls going up, building 23
Walls going up, building 23
Walls going up, building 23
Walls going up, Building 23
Looking toward building 12
Looking toward building 5
Pool view looking toward building 12
Looking toward building 5
Positioning of third pool in the middle of buildings 4, 5, 12, and 13
View of the pool postition that is closest to buildings 2-6
View of pool from building 9
Pool view from building 9
Looking at pool from building 9
View of pool looking at builing 2 and 3
View of pool looking at building 2 and 3
View of pool looking toward building 8
Pool looking toward building 8
View of the pool position that is closest to buildings 1, 7, 8, and 9
Pool view looking toward 9
Pools on beach
Preparing for beam
Footers poured on top of pilings3
Building 24, preparing for floor beam
Building 24, footers being poured on top of pilings
Footers poured on top of pilings
Footer poured on top of pilings2
Footer form with steel
Cement mixing
Concrete mixing assembly line
Steel tied for beam and rough plumbing being installed
Steel tied for floor beam and rough plumbing installed
Building 23, steel tied for floor beam and rough plumbing completed
Laying out steel for beam
Laying out steel for beam3
Laying out steel for beam2
Building 23, steel layout for floor beams
Footers on top of piling with stel being poured
Footers poured on top of pilings
Vibrating the air pockets out
Vibrating air pockets out of footers
Building 23, footers formed on top of piles
Building 22 and 23
23 and 22
Sunk
Water jets4
Sinking
Water jets2
Water jets3
Building 22, water jetting piles down
Water jet5
Piles sunk to coral bed
Sunk to coral bed
Waterjet pump
How to sink piles
Piles to be installed
Fine Stucco and Paint6
Building 19, Stucco and Paint
Fine stucco and Paint
Fine Stucco and Paint4
Fine stucco and paint5
Fine Stucco and Paint7
Fine Stucco and Paint2
Fine Stucco and Paint3
Building 19 fine stucco and Paint
Building 18, view from balcony
18c view from balcony
Building 18, preparing
forms for ceiling
18c preparig forms for ceiling
18c main living area2
Building 18, main living area
18c main living area
15 exterior stucco2
Building 15, exterior stucco
15 exterior stucco
Photos from October 20th, 2010