Building 24, preparing for floor beam
Building 24, footers being poured on top of pilings




Concrete mixing assembly line


Building 23, steel tied for floor beam and rough plumbing completed



Building 23, steel layout for floor beams


Vibrating the air pockets out

Building 23, footers formed on top of piles
Building 22 and 23

Sunk

Sinking


Building 22, water jetting piles down


Sunk to coral bed

How to sink piles


Building 19, Stucco and Paint






Building 19 fine stucco and Paint
Building 18, view from balcony

Building 18, preparing
forms for ceiling
forms for ceiling


Building 18, main living area


Building 15, exterior stucco

Photos from October 20th, 2010